Client Requirement & Operating Constraints
An operating cement plant needed its production line parts – clinker chutes, conveyor structures and feed hoppers – replaced within a maintenance shutdown of no more than 21 days, with the line back at full capacity on restart.
Strict defined criteria:
- Full installation inside the planned shutdown window, with no delay.
- High wear resistance on surfaces in contact with hot clinker.
- Dimensions matching the existing equipment, with no site modifications.